Power Infrastructure Projects
Our Recent Projects
- FT Feeder upgrade involving approximately 2 km to install 4 x 140 mm of directional drilling through Kensington on behalf of Jemena.
- 3 km to install 4 x 140 mm of directional drilling throughout Moonee Ponds
- 2 km to install 4 x 125 mm of open cutting conduit installation through Tullamarine.
- 8 x 66kv Feeder exists RTS
- KTS split loop, directional drilling 3 x 140l m x 450 mm dia in basalt under Western Ring Road, Tullamarine.
- Currently: RPV traction 4 km to install 4 x 150 mm open cut excavation and directional drilling in Footscray.
Communications Projects
Our Recent Projects
- Telstra relocation works at Domain Precinct (MMRA)
- Telstra relocation works at Parkville Precinct (MMRA)
- Ballet Art Centre Melbourne